Pages

Sunday, 15 September 2013

Transportation complete


We loaded part one and two of the ‘horn’ (joined),  on to the truck at 8pm on Friday night in the pouring rain. As soon as we had finished securing the load,  the rain stopped… We were all absolutely soaked through and my hair was plastered to my head as though I had been swimming!
We left the house at 7.15 the next morning en route for Kingston St Mary. A convoy of one truck and one car. David, Chris and myself were allocated the lifting whilst Peter’s role was as official photographer (and for a thirteen year old, I think he did a pretty good job).  Luckily it was not raining and although the garden was full of early morning wetness, the sun was shining and the trees and plants looked fantastic.
The first load was the most problematical but the second load was a complete doddle.
Tuesday is installation day and is everybody happy??? I shall be if it doesn’t rain!












No comments:

Post a Comment